Proyek Kami


Proyek
Kami telah menyelesaikan berbagai proyek konstruksi dengan sukses, termasuk Steel Structure, Piping, Storage Tank, Insulation, Cooling Tower, Sandblasting, dan Fiber Optic. Lihatlah beberapa proyek terbaru kami di bawah ini.


PT. Sinergy Oil Nusantara - Batam
New Jetty Piping Line CPO, CPKO RBDPKO, CA (2023)


PT. Satnusa Persada Tbk - Batam
Repair Service Supoort Cooling Tower SN8 No. 1 (2023)
PT. Satnusa Persada Tbk - Batam
Repair Service Supoort Cooling Tower Gate Offce (2023).


PT. PGASCOM Medan
Perbaikan Kabel Fiber Optik Putus (2023).


PT. Satnusa Persada Tbk - Batam
Job Ducting Exause Fan STP 2 & 4 (2022).
PT. Sinergy Oil Nusantara - Batam
Instalasi & Insultion Pipe Line Blowdown (2022).
PT. Sinergy Oil Nusantara - Batam
Pipe Line CIE Tank (2022).
PT. Ecogreen Oleochemicals - Batam
Piping Work SS, Repair Inlet Header Feed (2022).
PT. Satnusa Persada Tbk - Batam
Pembongkaran & Pemasangan Supoort Cooling Tower SN5, No. 4 (2022)
PT. Sinergy Oil Nusantara - Batam
Instalation Pipe Line CIE Tank Lauric Plant (2022).


PT. Sinergy Oil Nusantara - Batam
Refinery Plant (2022).
PT. Sinergy Oil Nusantara - Batam
Storage Tank Cap 2000 MT (2022).


PT. Sinergy Oil Nusantara - Batam
Piping Work New Jetty (2022).
PT. Sinergy Oil Nusantara - Batam
Insulation Tank Cap 300MT (2022).


PT. PGASCOM Medan
Perbaikan Fiber Optik Segment 48 Innercity Medan (2021).


PT. PGASCOM Medan
Install Kabel Feeder 7/8 Site Paya Geli(2021).


PT. Musim Mas -Batam
Insulation Pipe OSBL (2021).
PT. Sinergy Oil Nusantara - Batam
Modification of Pipe Line ABS Chiller ( 2021).
PT. Musim Mas -Batam
Insulation ISBL Special Refining Traetment Plan 1800 TPD Retinery (2020).


PT. Musim Mas -Batam
Insulation Pipe HP Boiler 35 TPH Coal (2020).


PT. Sinergy Oil Nusantara - Batam
Storage Tank Recondition & Relocation (2019).
PT. Musim Mas -Batam
Insulation Pipe Ducting Boiler Thermal Oil (2018).


PT. Sinergy Oil Nusantara - Batam
Installation of Pipe Line CPO, CPKO, RBDPKO (2018).


PT. Satnusa Persada Tbk - Batam
Installation of Pump& Pipe Line To Chiller (2017)
PT. Sinergy Oil Nusantara - Batam
Instalation Hyder And Pipe Line Hydrant (2015).


PT. Sinergy Oil Nusantara - Batam
Main Gas Pipe Modit & Piping New Boiler (2014).
PT. Sinergy Oil Nusantara - Batam
Storage Oil Tank CS Cap. 3,500 MT (2015).


Pipe Line CPO, CPKO, RBDPKO, CA (2014).
PT. Sinergy Oil Nusantara - Batam
PT. Sinergy Oil Nusantara - Batam


PT. Sinergy Oil Nusantara - Batam
Installation 0f HP Gaironi Boiler & Piping (2012).
Storage Tank SS Cap. 100 MT.(3 Unit)


PT. Sinergy Oil Nusantara - Batam


PT. Sinergy Oil Nusantara - Batam
Painting 6 Unit Storage Tank CS 5.000 MT (2011)
Blending Tank Piping Work ( 2012 ).


PT. Sinergy Oil Nusantara - Batam


PT. Sinergy Oil Nusantara - Batam
Storage Tank PFAD SS 304 1.100 mt (2011).
Storage Tank SS 100 MT (3Nos) & 50 MT (2Nos) (2011).


PT. Musim Mas - Batam


PT. Sinergy Oil Nusantara - Batam
Storage Tank PFAD SS 304 1.100 mt (2011).
Installation Pipe ( 2011 ).